Salt Spring Island dPA 3 - Shoreline

There are currently 7 DPA’s in place for Salt Spring Island. DPA 3 is featured in this post. 

Salt Spring Island Development Permit Area 3 (DPA 3) – Shoreline

What is DPA 3? DPA 3 regulates development along Salt Spring Island’s shoreline to protect the marine environment, prevent erosion, and ensure responsible commercial development (Map 20).

When is a Permit Needed? A Development Permit is required for:

  • Constructing buildings.

  • Expanding or building docks over 35 m².

  • Constructing multiple mooring facilities, breakwaters, jetties, or stabilization works.

  • Placing fill, dredging, or building boat ramps.

  • Removing trees (20 cm+ trunk diameter) or exposing over 9 m² of bare soil within 10 m of the shoreline.

  • Installing large signs or commercial light standards on the water.

  • Subdividing land within the permit area.

Exemptions:

  • Farming activities over 3 m from the shoreline.

  • Forestry and approved fish habitat enhancements.

  • Emergency tree removal or flood prevention.

  • Government-approved shoreline alterations.

  • Subdivision with conservation covenants protecting sensitive areas.

Why is DPA 3 Important?

  • Protects Marine Life: Prevents habitat destruction.

  • Prevents Erosion & Hazards: Maintains natural shoreline stability.

  • Preserves Scenic Beauty: Ensures development blends with the environment.

DPA 3 safeguards Salt Spring Island’s shoreline while allowing sustainable development.

See the complete Official Community Plan here

Visit the Island Trust complete list of Maps here

See the PDF below for Specific guidelines around DPA 3